Maultway Bridge closure

The Highways Agency will be replacing the bridge deck joints of the B3015 Maultway Bridge over the M3 near Camberley, Surrey, to reduce the risk of deterioration of the structure.

The work is scheduled to take place between 8am and 4pm on weekdays only, from Wednesday 9 October for eight days.

During these hours the B3015 Maultway Bridge will be fully closed to road users and a signed diversion route will be in place via the B311 Chobham Road and the A325 Portsmouth Road.

Posted in Uncategorized